3C Electronics-Tsinghua Tongfang-Transfer Project

Project Background

1. Summary of the difficulties of the project: The main problems faced by this project are the large size of transported materials, high cleanliness requirements, a large number of docking machines and different docking heights, and a high error rate in manual handling.

2. Functions and benefits provided by CASUN AGV: By importing CASUN AGV, manual handling is replaced. The unmanned operation of the whole line greatly improves the degree of intelligent manufacturing and transportation efficiency, ensures the integrity and traceability of the logistics data chain, and improves the yield rate.


Project Characteristics

Project Characteristics
1. The cleanliness of the dust-free workshop is high

The workshop where the project is located is a dust-free workshop, which has high requirements for the dust-free treatment of the truck body.


2. Manpower-intensive, high salary costs

In order to meet the fast-paced production efficiency, the demand for porters is large and the working hours are long, which in turn leads to high salary costs and management costs.


Project Background

Project Alternatives

1. The project uses 2 QR code carrying AGVs, 1 set of automatic charging columns, etc.

2. With the docking with MES, the material can be ordered independently, and the optimal transportation route can be intelligently planned.

3. The perfect combination of CASUN AGV intelligent management system + WMS storage location management system realizes intelligent scheduling and intelligent warehousing.


Project Advantages

Adapt to the scene
Adapt to the scene

It is suitable for SMT dust-free workshop, and the vehicle is equipped with an electrostatic processing device to meet the SMT electrostatic requirements.

Intelligent scheduling and efficient operation
Intelligent scheduling and efficient operation

AGV intelligent control system and MES system docking.

No infrastructure construction, flexible application
No infrastructure construction, flexible application

Deploy in one step without expensive infrastructure and without waiting for downtime. After the equipment arrives at the site, it can be quickly online and put into production within 7 days.

Project Benefits

Project Benefits

Reduce equipment and labor input costs
Reduce equipment and labor input costs

Improve flexible processes, save labor costs, and reduce labor load.


Improve the timeliness of material transportation
Improve the timeliness of material transportation

The transportation accuracy rate is increased to 99%, which can meet the peak demand of full production of the whole line.